Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,558
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2311 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,574 | $6,440 | Implemented |
IP0164 # 08 Y:2022 | 08 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $489 | $2,128 | Not Implemented |
IP0164 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $803 | Implemented |
IP0164 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $972 | $1,279 | Implemented |
IP0164 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,709 | $1,228 | Implemented |
IP0164 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $1,271 | Implemented |
IP0164 # 03 Y:2022 | 03 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,643 | $1,028 | Not Implemented |
IP0164 # 02 Y:2022 | 02 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,853 | $2,064 | Not Implemented |
IP0164 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,649 | $1,428 | Implemented |
MU0004 # 01 Y:2022 | 01 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,123 | $0 | Implemented |
MU0004 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,089 | $4,922 | Implemented |
MU0004 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $845 | $2,773 | Implemented |
MU0004 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $673 | $0 | Not Implemented |
MU0004 # 05 Y:2022 | 05 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $250 | $0 | Implemented |
MU0004 # 06 Y:2022 | 06 | 2022 | COMBINE UTILITY METERS | $180 | $0 | Implemented |
MU0004 # 07 Y:2022 | 07 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $58 | $77 | Implemented |
UU0205 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,629 | $10,629 | Not Implemented |
UU0205 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $10,548 | $18,900 | Not Implemented |
UU0205 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,310 | $28,263 | Not Implemented |
UU0205 # 04 Y:2022 | 04 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,404 | $9,200 | Not Implemented |
UU0205 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,293 | $198 | Implemented |
UU0205 # 06 Y:2022 | 06 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,070 | $150 | Not Implemented |
UU0205 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $382 | $720 | Not Implemented |
IP0158 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $173 | $0 | Implemented |
IP0158 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,990 | $0 | Implemented |