IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,558

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0666 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,885 $0 Implemented
UD0666 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,247 $325 Not Implemented
UD0666 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $3,082 $0 Not Implemented
UD0666 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,266 $8,500 Not Implemented
UD0666 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented
UD0666 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,020 Implemented
UD0666 # 11 Y:2003 11 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $835 $1,700 Not Implemented
UD0666 # 12 Y:2003 12 2003 DISCONNECT BALLASTS $810 $0 Not Implemented
UD0666 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $740 $100 Not Implemented
UD0666 # 14 Y:2003 14 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $635 $150 Not Implemented
UD0666 # 15 Y:2003 15 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $720 Not Implemented
UD0666 # 16 Y:2003 16 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $175 $0 Implemented
SU0155 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $20,634 $768 Not Implemented
SU0155 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,787 $1,200 Implemented
SU0155 # 03 Y:2003 03 2003 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,200 $8,636 Not Implemented
SU0155 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,056 $0 Implemented
SU0155 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,016 $0 Implemented
SU0155 # 06 Y:2003 06 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,195 $4,877 Not Implemented
SU0155 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $320 Implemented
SU0155 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $420 Not Implemented
SU0155 # 09 Y:2003 09 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $901 $1,660 Not Implemented
SU0155 # 10 Y:2003 10 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $381 $500 Implemented
SU0155 # 11 Y:2003 11 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $326 $0 Implemented
AS0341 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $6,789 Not Implemented
AS0341 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $834 $891 Not Implemented