Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,558
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0666 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,885 | $0 | Implemented |
UD0666 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,247 | $325 | Not Implemented |
UD0666 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $3,082 | $0 | Not Implemented |
UD0666 # 08 Y:2003 | 08 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,266 | $8,500 | Not Implemented |
UD0666 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,000 | $0 | Implemented |
UD0666 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,000 | $2,020 | Implemented |
UD0666 # 11 Y:2003 | 11 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $835 | $1,700 | Not Implemented |
UD0666 # 12 Y:2003 | 12 | 2003 | DISCONNECT BALLASTS | $810 | $0 | Not Implemented |
UD0666 # 13 Y:2003 | 13 | 2003 | DISCONNECT BALLASTS | $740 | $100 | Not Implemented |
UD0666 # 14 Y:2003 | 14 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $635 | $150 | Not Implemented |
UD0666 # 15 Y:2003 | 15 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $720 | Not Implemented |
UD0666 # 16 Y:2003 | 16 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $175 | $0 | Implemented |
SU0155 # 01 Y:2003 | 01 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $20,634 | $768 | Not Implemented |
SU0155 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,787 | $1,200 | Implemented |
SU0155 # 03 Y:2003 | 03 | 2003 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,200 | $8,636 | Not Implemented |
SU0155 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,056 | $0 | Implemented |
SU0155 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,016 | $0 | Implemented |
SU0155 # 06 Y:2003 | 06 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,195 | $4,877 | Not Implemented |
SU0155 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $320 | Implemented |
SU0155 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,406 | $420 | Not Implemented |
SU0155 # 09 Y:2003 | 09 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $901 | $1,660 | Not Implemented |
SU0155 # 10 Y:2003 | 10 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $381 | $500 | Implemented |
SU0155 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $326 | $0 | Implemented |
AS0341 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,096 | $6,789 | Not Implemented |
AS0341 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $834 | $891 | Not Implemented |