IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,558

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0151 # 06 Y:2000 06 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $1,181 $800 Not Implemented
BD0151 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,932 $8,000 Not Implemented
AM0361 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $576,720 $201,440 n/a
AM0361 # 02 Y:2000 02 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $2,905 n/a
AM0361 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $20,600 $41,200 n/a
AM0361 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $4,920 $600 n/a
AM0361 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $4,274 $0 n/a
AM0361 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $1,930 $300 n/a
AM0361 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $100 n/a
AM0361 # 08 Y:2000 08 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $430 $120 n/a
NV0141 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $562 Not Implemented
NV0141 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,845 $2,532 Implemented
NV0141 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,401 $0 Implemented
AR0174 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $759 $1,307 Not Implemented
AR0174 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $0 Not Implemented
AR0174 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,097 $21,814 Not Implemented
AR0174 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $22,202 $180 Not Implemented
AR0174 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,046 $402 Not Implemented
AR0174 # 06 Y:1999 06 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,894 $280 Not Implemented
ME0268 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $4,763 Implemented
ME0268 # 02 Y:1999 02 1999 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $1,000 $0 Implemented
ME0268 # 03 Y:1999 03 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $860 $0 Implemented
ME0268 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $697 $300 Implemented
ME0268 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $250 Implemented
ME0268 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $567 $54 Not Implemented