IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,534

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0170 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,931 $24,300 Implemented
WM0170 # 02 Y:2021 02 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $4,328 $3,000 Implemented
WM0170 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,204 $875 Not Implemented
WM0170 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,851 $3,500 Implemented
WM0170 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,828 $1,500 Not Implemented
WM0170 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $598 $880 Not Implemented
WM0170 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $182 Implemented
WM0170 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $216 $260 Implemented
OR0743 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,625 $0 Implemented
OR0743 # 02 Y:2021 02 2021 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,808 $8,548 Implemented
OR0743 # 03 Y:2021 03 2021 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $29,553 $281,475 Implemented
OK1051 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $7,393 Implemented
OK1051 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $8,210 $4,500 Not Implemented
OK1051 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,614 $677 Implemented
OK1051 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,449 $0 Not Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MA0825 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $35,925 $3,200 Not Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
OK1050 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,327 $0 Not Implemented
OK1050 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,760 $900 Implemented
OK1050 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,379 $1,973 Not Implemented
AM0819 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,370 $11,040 Implemented
AM0819 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,030 $1,000 Implemented