Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,534

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0345 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,565 $415 Implemented
TN0345 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $6,252 $14,499 Implemented
TN0345 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $135 $5,000 Not Implemented
TN0345 # 04 Y:1988 04 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $770 $0 Implemented
TN0345 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,491 $0 Implemented
TN0345 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $270 Not Implemented
TN0345 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $294 Implemented
UD0255 # 01 Y:1988 01 1988 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $7,000 $8,000 Not Implemented
UD0255 # 02 Y:1988 02 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,509 $13 Not Implemented
UD0255 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,435 $2,000 Not Implemented
UD0255 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $350 $0 Implemented
TN0331 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $4,805 $1,029 Implemented
TN0331 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $4,469 $3,650 Implemented
TN0331 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,263 $1,014 Implemented
TN0331 # 04 Y:1988 04 1988 REPAIR OR REPLACE STEAM TRAPS $3,440 $725 Implemented
TN0331 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,980 $550 Implemented
TN0331 # 06 Y:1988 06 1988 REPAIR AND ELIMINATE STEAM LEAKS $932 $665 Implemented
TN0331 # 07 Y:1988 07 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $656 $885 Implemented
TN0333 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $10,014 $3,720 Implemented
TN0333 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $15,171 $53,969 Implemented
TN0333 # 03 Y:1988 03 1988 INSTALL SET-BACK TIMERS $10,455 $0 Implemented
TN0333 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,042 $180 Implemented
TN0333 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $903 $750 Implemented
TN0333 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150 $0 Implemented
TN0333 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $1,120 $252 Not Implemented