Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0222 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,835 | $2,232 | Not Implemented |
BD0222 # 15 Y:2002 | 15 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,004 | $0 | Not Implemented |
BD0222 # 14 Y:2002 | 14 | 2002 | AUTOMATE PAYROLL SYSTEM | $24,960 | $17,300 | Implemented |
BD0222 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $70,000 | $40,000 | Implemented |
BD0222 # 12 Y:2002 | 12 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $126 | $100 | Not Implemented |
BD0222 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $200 | Not Implemented |
BD0222 # 10 Y:2002 | 10 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $652 | $0 | Not Implemented |
BD0222 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $1,141 | $1,018 | Not Implemented |
BD0222 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,901 | $2,000 | Not Implemented |
BD0222 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $2,219 | $1,425 | Not Implemented |
BD0222 # 06 Y:2002 | 06 | 2002 | INSTALL TURBULATORS | $2,272 | $3,500 | Not Implemented |
BD0222 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,027 | $1,000 | Not Implemented |
BD0222 # 04 Y:2002 | 04 | 2002 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,079 | $6,000 | Not Implemented |
BD0222 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,898 | $12,020 | Implemented |
BD0222 # 01 Y:2002 | 01 | 2002 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $185,274 | $20,000 | Not Implemented |
UU0031 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58 | $366 | Not Implemented |
UU0031 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,112 | $0 | Not Implemented |
UU0031 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,692 | $20 | Not Implemented |
UU0031 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $121,213 | $2,000,000 | Not Implemented |
UU0031 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $12,207 | $18,000 | Not Implemented |
UU0029 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,000 | $1,570 | Implemented |
UU0029 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,840 | $8,250 | Not Implemented |
UU0029 # 05 Y:2002 | 05 | 2002 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $229 | $1,650 | Not Implemented |
UU0029 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,710 | $0 | Not Implemented |
UU0029 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $290 | $530 | Not Implemented |