IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3911 Jewelry, Precious Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0456 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,269 $19,500 Not Implemented
BD0456 # 03 Y:2015 03 2015 USE POWER DURING OFF-PEAK PERIODS $5,111 $17 Not Implemented
BD0456 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $1,219 Not Implemented
BD0456 # 05 Y:2015 05 2015 USE POWER DURING OFF-PEAK PERIODS $1,111 $17 Not Implemented
BD0456 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $843 $920 Not Implemented
BD0456 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,500 Implemented
BD0456 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $678 $210 Not Implemented
BD0456 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,006 $548 Implemented
BD0456 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $400 Implemented
BD0456 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $374 $750 Not Implemented
BD0456 # 01 Y:2015 01 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,758 $5,000 Not Implemented
CO0618 # 03 Y:2008 03 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $5,170 $61,600 Implemented
CO0618 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,050 $640 Implemented
CO0618 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,780 $50,000 Implemented
CO0618 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,950 $42,300 Implemented
CO0618 # 02 Y:2008 02 2008 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $19,720 $10,000 Implemented
CO0618 # 01 Y:2008 01 2008 USE POWER DURING OFF-PEAK PERIODS $15,050 $0 Not Implemented
UU0031 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $12,207 $18,000 Not Implemented
UU0031 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,112 $0 Not Implemented
UU0031 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,692 $20 Not Implemented
UU0031 # 04 Y:2002 04 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $121,213 $2,000,000 Not Implemented
UU0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58 $366 Not Implemented
UU0029 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,710 $0 Not Implemented
UU0029 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $1,000 $1,570 Implemented
UU0029 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,840 $8,250 Not Implemented