IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 393 Musical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0294 # 07 Y:2008 07 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,841 $210 Not Implemented
LL0294 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $645 $90 Implemented
LL0294 # 06 Y:2008 06 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,006 $1,880 Not Implemented
LL0294 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,740 $2,539 Not Implemented
LL0294 # 04 Y:2008 04 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,897 $1,210 Implemented
LL0294 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,541 $10,640 Not Implemented
LL0294 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $16,326 $5,201 Not Implemented
LL0294 # 01 Y:2008 01 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,560 $45,800 Not Implemented
LL0294 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $527 $350 Not Implemented
CO0535 # 09 Y:2003 09 2003 MODIFY WORKLOAD $30,340 $6,600 Not Implemented
CO0535 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $112 Implemented
CO0535 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $670 $1,210 Not Implemented
CO0535 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $1,100 $2,820 Not Implemented
CO0535 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $9,690 Implemented
CO0535 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,840 $6,420 Not Implemented
CO0535 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,820 $6,420 Implemented
CO0535 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,160 $15,760 Implemented
CO0535 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,340 $750 Implemented
LE0108 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,248 $0 Implemented
LE0108 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,738 $3,120 Implemented
LE0108 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,746 $2,500 Not Implemented
LE0108 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $500 Implemented
GT0713 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,350 $840 Not Implemented
GT0713 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $77,243 $235,000 Not Implemented
GT0713 # 01 Y:2001 01 2001 USE POWER DURING OFF-PEAK PERIODS $22,943 $0 Not Implemented