IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

632

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0209 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,568 $13,000 Not Implemented
SD0209 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,000 $0 Not Implemented
SD0209 # 09 Y:1998 09 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $89,794 $81,000 Not Implemented
SD0209 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,300 $8,000 Not Implemented
OK0549 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,094 $90,923 Not Implemented
OK0549 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,165 $3,300 Implemented
OK0549 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,469 $170 Implemented
OK0549 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,060 $680 Not Implemented
OK0549 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $24,960 $10,000 Implemented
OK0549 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $6,240 $2,044 Implemented
OK0549 # 07 Y:1998 07 1998 METER WASTE WATER $1,377 $0 Not Implemented
UM0122 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $10,711 $6,800 Not Implemented
UM0122 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $1,000 Not Implemented
UM0122 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $950 $1,470 Not Implemented
UM0122 # 04 Y:1998 04 1998 USE A RAG RECYCLE SERVICE $5,818 $0 Not Implemented
UM0122 # 05 Y:1998 05 1998 METER WASTE WATER $761 $150 Not Implemented
UM0122 # 06 Y:1998 06 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,300 $0 Not Implemented
AS0199 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $410 $0 Implemented
AS0199 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,976 $140 Implemented
AS0199 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $570 $300 Not Implemented
AS0199 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,593 $12,000 Not Implemented
AS0199 # 05 Y:1997 05 1997 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,117 $7,000 Not Implemented
AS0199 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,411 $3,015 Not Implemented
AS0199 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,995 $13,000 Not Implemented
AS0199 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,635 $3,183 Implemented