Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
632
matching recommendationsSIC | 394 | Toys And Sporting Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0209 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $108,568 | $13,000 | Not Implemented |
SD0209 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,000 | $0 | Not Implemented |
SD0209 # 09 Y:1998 | 09 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $89,794 | $81,000 | Not Implemented |
SD0209 # 10 Y:1998 | 10 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,300 | $8,000 | Not Implemented |
OK0549 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,094 | $90,923 | Not Implemented |
OK0549 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,165 | $3,300 | Implemented |
OK0549 # 03 Y:1998 | 03 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,469 | $170 | Implemented |
OK0549 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,060 | $680 | Not Implemented |
OK0549 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $24,960 | $10,000 | Implemented |
OK0549 # 06 Y:1998 | 06 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $6,240 | $2,044 | Implemented |
OK0549 # 07 Y:1998 | 07 | 1998 | METER WASTE WATER | $1,377 | $0 | Not Implemented |
UM0122 # 01 Y:1998 | 01 | 1998 | INSTALL OCCUPANCY SENSORS | $10,711 | $6,800 | Not Implemented |
UM0122 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $557 | $1,000 | Not Implemented |
UM0122 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $950 | $1,470 | Not Implemented |
UM0122 # 04 Y:1998 | 04 | 1998 | USE A RAG RECYCLE SERVICE | $5,818 | $0 | Not Implemented |
UM0122 # 05 Y:1998 | 05 | 1998 | METER WASTE WATER | $761 | $150 | Not Implemented |
UM0122 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $29,300 | $0 | Not Implemented |
AS0199 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $410 | $0 | Implemented |
AS0199 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,976 | $140 | Implemented |
AS0199 # 03 Y:1997 | 03 | 1997 | USE SYNTHETIC LUBRICANT | $570 | $300 | Not Implemented |
AS0199 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,593 | $12,000 | Not Implemented |
AS0199 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,117 | $7,000 | Not Implemented |
AS0199 # 06 Y:1997 | 06 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,411 | $3,015 | Not Implemented |
AS0199 # 07 Y:1997 | 07 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,995 | $13,000 | Not Implemented |
AS0199 # 08 Y:1997 | 08 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,635 | $3,183 | Implemented |