IAC Assessment: UF0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Archery Equipment
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 154,175
Annual Production 100,000 Pieces
Production Hrs. Annual 5,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,015 3,249,121 kWh $0.05
Electricity Demand $48,118 10,976 kW-months/year $4.38
TOTAL ENERGY COSTS $206,133
RECOMMENDED SAVINGS* $44,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,769
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$5,948
Cost:
$40
$5,948 106,389 - - - - - - - - - - $5,948
106,389
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,084
Cost:
$5,604
$1,615 32,825 $469 9 - - - - - - - - $1,615
32,825
kWh
$469
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,102
Cost:
$5,000
- - $2,102 480 - - - - - - - - -
-
kWh
$2,102
480
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$4,202
Cost:
$14,000
$3,822 77,960 $1,577 30 $(-1,197) (-266) - - - - - - $3,822
77,960
kWh
$1,577
30
kW-months/year
$(-1,197)
(-266)
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,615
Cost:
-
- - - - - - $2,615 44,700 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,615
44,700
lb
-
-
$
-
-
$
06: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$21,236
Cost:
$2,240
- - - - - - - - $21,236 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$21,236
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,070
Cost:
-
- - - - - - - - - - $6,070 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$6,070
-
$
TOTAL RECOMMENDED Savings:
$44,257
Cost:
$26,884
$11,385 217,174 $4,148 519 $(-1,197) (-266) $2,615 44,700 $21,236 - $6,070 - $11,385
217,174
kWh
$4,148
519
kW-months/year
$(-1,197)
(-266)
MMBtu
$2,615
44,700
lb
$21,236
-
$
$6,070
-
$
TOTAL IMPLEMENTED Savings:
$10,769
Cost:
$5,604
$1,615 32,825 $469 9 - - $2,615 44,700 - - $6,070 - $1,615
32,825
kWh
$469
9
kW-months/year
-
-
MMBtu
$2,615
44,700
lb
-
-
$
$6,070
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost