Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

641

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0514 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $799 $1,584 Not Implemented
AS0514 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,222 $8,635 Not Implemented
AS0514 # 01 Y:2022 01 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $138,858 $8,368 Not Implemented
AS0514 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,545 $141,340 Not Implemented
AS0514 # 05 Y:2022 05 2022 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $7,266 $30,762 Not Implemented
AS0514 # 03 Y:2022 03 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,435 $4,628 Not Implemented
CL2012 # 03 Y:2020 03 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $16,920 $0 Not Implemented
CL2012 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,598 $22,698 Not Implemented
CL2012 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $770 $0 Not Implemented
CL2012 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $81,451 $690,939 Not Implemented
UD1021 # 07 Y:2020 07 2020 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,594 $1,590 Not Implemented
UD1021 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,902 $7,800 Not Implemented
UD1021 # 11 Y:2020 11 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $249 $240 Not Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,841 $0 Implemented
UD1021 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,965 $1,400 Not Implemented
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
UF0537 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $61,119 Not Implemented
UF0537 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $55,866 $333,760 Not Implemented
UF0537 # 08 Y:2019 08 2019 UPGRADE CONTROLS ON COMPRESSORS $4,046 $6,800 Not Implemented
UF0537 # 10 Y:2019 10 2019 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $40,781 $21,000 Not Implemented