IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0433 # 06 Y:1991 06 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,993 $75,000 Implemented
TN0433 # 05 Y:1991 05 1991 USE COMPRESSOR AIR FILTERS $629 $25 Implemented
TN0433 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $802 $180 Implemented
TN0433 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $152 Implemented
TN0433 # 02 Y:1991 02 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,102 $19,000 Implemented
TN0433 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,552 $3,000 Implemented
TN0281 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $105 Implemented
TN0281 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93 $0 Implemented
TN0281 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $674 $240 Not Implemented
TN0281 # 08 Y:1986 08 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $737 $220 Not Implemented
TN0281 # 06 Y:1986 06 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $529 $182 Not Implemented
TN0281 # 05 Y:1986 05 1986 ADJUST VENTS TO MINIMIZE ENERGY USE $3,340 $0 Implemented
TN0281 # 04 Y:1986 04 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,415 $7,500 Not Implemented
TN0281 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $4,465 $1,491 Not Implemented
TN0281 # 02 Y:1986 02 1986 COVER OPEN TANKS $5,049 $650 Not Implemented
TN0281 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $6,608 $4,408 Implemented
TN0120 # 01 Y:1982 01 1982 COVER OPEN TANKS $1,500 $150 Not Implemented
TN0120 # 04 Y:1982 04 1982 REDUCE VENTILATION AIR $1,104 $0 Not Implemented
TN0120 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,280 $21,600 Not Implemented
TN0120 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $530 $0 Not Implemented