IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0205 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $10,629 Not Implemented
UU0205 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,310 $28,263 Not Implemented
UU0205 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $10,548 $18,900 Not Implemented
UU0205 # 06 Y:2022 06 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,070 $150 Not Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UU0205 # 04 Y:2022 04 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,404 $9,200 Not Implemented
UU0205 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $720 Not Implemented
AM0648 # 02 Y:2013 02 2013 RECYCLE WASTE INK AND CLEANUP SOLVENT $29,607 $0 Implemented
AM0648 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $101 $308 Not Implemented
AM0648 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $2,016 $0 Implemented
AM0648 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,176 $5,000 Implemented
AM0648 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $16,856 $22,350 Implemented
AM0648 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $10,740 $0 Implemented
AM0648 # 05 Y:2013 05 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,304 $45,000 Implemented
AM0648 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,059 $167 Implemented
AM0648 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,544 $18,524 Implemented
AM0648 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,230 $500 Implemented
AM0648 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $9 Implemented
UU0065 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,345 $1,100 Implemented
UU0065 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,650 $675 Not Implemented
UU0065 # 04 Y:2004 04 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $1,188 $225 Implemented
UU0065 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $4,060 $5,520 Not Implemented
UU0065 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,450 $0 Implemented
UU0022 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,022 $326 Implemented
UU0022 # 05 Y:2002 05 2002 UPGRADE OBSOLETE EQUIPMENT $18,175 $80,000 Not Implemented