Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
137
matching recommendationsSIC | 3944 | Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0199 # 06 Y:2015 | 06 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,502 | $27,000 | Not Implemented |
CO0646 # 08 Y:2011 | 08 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $150 | $40 | Implemented |
CO0646 # 07 Y:2011 | 07 | 2011 | INSTALL WIND POWERED ELECTRIC GENERATOR | $270 | $5,260 | Not Implemented |
CO0646 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,340 | $2,730 | Implemented |
CO0646 # 05 Y:2011 | 05 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,910 | $35,000 | Not Implemented |
CO0646 # 04 Y:2011 | 04 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,080 | $14,690 | Not Implemented |
CO0646 # 03 Y:2011 | 03 | 2011 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,120 | $10,000 | Implemented |
CO0646 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,270 | $7,320 | Not Implemented |
CO0646 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,270 | $62,380 | Not Implemented |
WV0368 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $181 | $60 | Implemented |
WV0368 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $296 | $600 | Not Implemented |
WV0368 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $747 | $1,927 | Implemented |
WV0368 # 03 Y:2008 | 03 | 2008 | INSTALL SPECTRAL REFLECTORS / DELAMP | $825 | $140 | Not Implemented |
WV0368 # 02 Y:2008 | 02 | 2008 | ELIMINATE/REDUCE AN OPERATION | $1,977 | $1,750 | Implemented |
WV0368 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $11,312 | $2,971 | Implemented |
WV0360 # 05 Y:2007 | 05 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,516 | $1,900 | Implemented |
WV0360 # 08 Y:2007 | 08 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,676 | $3,700 | Implemented |
WV0360 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,158 | $400 | Not Implemented |
WV0360 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,188 | $25 | Implemented |
WV0360 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,930 | $300 | Implemented |
WV0360 # 01 Y:2007 | 01 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $48,535 | $170,000 | Not Implemented |
WV0360 # 06 Y:2007 | 06 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,399 | $1,000 | Implemented |
WV0360 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,939 | $70,000 | Not Implemented |
WV0360 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,938 | $700 | Implemented |
WV0360 # 02 Y:2007 | 02 | 2007 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $44,169 | $15,000 | Not Implemented |