IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

137

matching recommendations
Reset
SIC 3944 Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0343 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,500 $50,000 Implemented
OR0343 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $17,775 $250 Not Implemented
OR0343 # 06 Y:1999 06 1999 UPGRADE CONTROLS ON COMPRESSORS $1,746 $0 Not Implemented
OR0343 # 07 Y:1999 07 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $403 $0 Not Implemented
OR0343 # 08 Y:1999 08 1999 OPTIMIZE PLANT POWER FACTOR $360 $1,000 Not Implemented
OR0343 # 09 Y:1999 09 1999 RECYCLE CLEANING SOLVENT AND REUSE $4,540 $6,000 Not Implemented
UM0122 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $10,711 $6,800 Not Implemented
UM0122 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $1,000 Not Implemented
UM0122 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $950 $1,470 Not Implemented
UM0122 # 04 Y:1998 04 1998 USE A RAG RECYCLE SERVICE $5,818 $0 Not Implemented
UM0122 # 05 Y:1998 05 1998 METER WASTE WATER $761 $150 Not Implemented
UM0122 # 06 Y:1998 06 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,300 $0 Not Implemented
WI0252 # 01 Y:1995 01 1995 INSTALL OCCUPANCY SENSORS $2,689 $975 Not Implemented
WI0252 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,268 $6,300 Not Implemented
WI0252 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,571 $2,665 Not Implemented
WI0252 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $786 $0 Implemented
WI0252 # 05 Y:1995 05 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,698 $5,500 Not Implemented
WI0252 # 06 Y:1995 06 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $690 $1,000 Not Implemented
WI0252 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $800 Not Implemented
WI0252 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $30 Implemented
WI0252 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $911 $4,200 Not Implemented
WI0252 # 10 Y:1995 10 1995 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $543 $525 Not Implemented
KU0423 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $1,663 Not Implemented
KU0423 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $240 $300 Implemented
KU0423 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $125 Implemented