Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3949 | Sporting And Athletic Goods, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0480 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $650 | $2,860 | Implemented |
GT0480 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $1,675 | $500 | Implemented |
GT0480 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $880 | $1,300 | Implemented |
GT0480 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $828 | $2,690 | Implemented |
GT0480 # 05 Y:1992 | 05 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,900 | $7,000 | Implemented |
OR0151 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,621 | $5,299 | Implemented |
OR0151 # 01 Y:1992 | 01 | 1992 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $648 | $0 | Not Implemented |
OR0151 # 02 Y:1992 | 02 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,166 | $1,710 | Implemented |
OR0151 # 03 Y:1992 | 03 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $450 | $700 | Implemented |
OR0151 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $135 | $2,510 | Implemented |
MO0066 # 09 Y:1992 | 09 | 1992 | INSULATE BARE EQUIPMENT | $208 | $69 | Not Implemented |
MO0066 # 08 Y:1992 | 08 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,433 | $973 | Not Implemented |
MO0066 # 07 Y:1992 | 07 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,207 | $1,200 | Implemented |
MO0066 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $311 | $210 | Implemented |
MO0066 # 05 Y:1992 | 05 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $439 | $4,000 | Implemented |
MO0066 # 04 Y:1992 | 04 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $224 | $250 | Not Implemented |
MO0066 # 03 Y:1992 | 03 | 1992 | RECOVER AND REUSE COOLING WATER | $3,103 | $640 | Not Implemented |
MO0066 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,249 | $1,100 | Implemented |
MO0066 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,899 | $18,800 | Implemented |
AS0058 # 02 Y:1992 | 02 | 1992 | USE HEAT PUMP FOR SPACE CONDITIONING | $33,994 | $182,325 | Implemented |
GT0467 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $30 | $0 | Not Implemented |
AS0058 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,257 | $64,053 | Implemented |
AS0058 # 03 Y:1992 | 03 | 1992 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $2,531 | $3,100 | Implemented |
AS0058 # 04 Y:1992 | 04 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $776 | $1,400 | Implemented |
AS0058 # 05 Y:1992 | 05 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,087 | $200 | Implemented |