IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
SIC 395 Pens, Pencils, Office, & Art Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0441 # 02 Y:2011 02 2011 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,379 $5,375 Not Implemented
UF0439 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,983 $11,500 Not Implemented
UF0439 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,264 $2,760 Not Implemented
UF0439 # 03 Y:2011 03 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,474 $5,800 Not Implemented
UF0439 # 01 Y:2011 01 2011 AIR CONDITION ONLY SPACE NECESSARY $5,313 $20,000 Not Implemented
UF0439 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,430 $4,040 Implemented
UF0439 # 07 Y:2011 07 2011 USE COMPRESSOR AIR FILTERS $1,555 $847 Implemented
UF0439 # 08 Y:2011 08 2011 UPGRADE CONTROLS ON COMPRESSORS $8,617 $500 Not Implemented
UF0439 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,289 $5,193 Implemented
UF0439 # 11 Y:2011 11 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $140,596 $3,840 Not Implemented
UF0439 # 12 Y:2011 12 2011 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $7,249 $4,555 Not Implemented
UF0439 # 09 Y:2011 09 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,007 $375 Not Implemented
UF0439 # 10 Y:2011 10 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,063 $816 Not Implemented
UF0378 # 04 Y:2006 04 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $10,260 $2,640 Implemented
UF0378 # 02 Y:2006 02 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,965 $5,044 Implemented
UF0378 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $7,955 $7,050 Not Implemented
UF0378 # 06 Y:2006 06 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $55,146 $7,392 Not Implemented
UF0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,845 $12,045 Implemented
UF0378 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,397 $507 Implemented
UF0378 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $4,427 $15,444 Implemented
UF0378 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,337 $598 Implemented
UF0375 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $129,429 $17,000 Implemented
UF0375 # 09 Y:2006 09 2006 $1,160,914 $79,825 Not Implemented
UF0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,929 $15,889 Not Implemented
UF0375 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,443 $49,050 Not Implemented