Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 395 | Pens, Pencils, Office, & Art Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0268 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,489 | $630 | Not Implemented |
WV0268 # 13 Y:2003 | 13 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $6,152 | $450 | Implemented |
WV0268 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,545 | $0 | Not Implemented |
WV0268 # 11 Y:2003 | 11 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,827 | $1,855 | Not Implemented |
WV0268 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $24,688 | $2,019 | Implemented |
WV0268 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $927 | $600 | Implemented |
WV0268 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,404 | $6,834 | Implemented |
WV0268 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,262 | $0 | Implemented |
WV0268 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,769 | $20,880 | Implemented |
WV0268 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,261 | $720 | Implemented |
WV0268 # 04 Y:2003 | 04 | 2003 | IMPROVE LUBRICATION PRACTICES | $1,165 | $810 | Not Implemented |
WV0268 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,612 | $250 | Implemented |
WV0268 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,435 | $108 | Implemented |
SU0155 # 01 Y:2003 | 01 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $20,634 | $768 | Not Implemented |
SU0155 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $326 | $0 | Implemented |
SU0155 # 10 Y:2003 | 10 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $381 | $500 | Implemented |
SU0155 # 09 Y:2003 | 09 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $901 | $1,660 | Not Implemented |
SU0155 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,406 | $420 | Not Implemented |
SU0155 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $320 | Implemented |
SU0155 # 06 Y:2003 | 06 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,195 | $4,877 | Not Implemented |
SU0155 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,016 | $0 | Implemented |
SU0155 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,056 | $0 | Implemented |
SU0155 # 03 Y:2003 | 03 | 2003 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,200 | $8,636 | Not Implemented |
SU0155 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,787 | $1,200 | Implemented |