IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
SIC 395 Pens, Pencils, Office, & Art Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0378 # 06 Y:2006 06 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $55,146 $7,392 Not Implemented
UF0378 # 04 Y:2006 04 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $10,260 $2,640 Implemented
UF0378 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,337 $598 Implemented
UF0378 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $4,427 $15,444 Implemented
UF0378 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,397 $507 Implemented
UF0378 # 02 Y:2006 02 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,965 $5,044 Implemented
UF0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,845 $12,045 Implemented
UF0378 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $7,955 $7,050 Not Implemented
UF0375 # 09 Y:2006 09 2006 INSTALL BACK-UP EQUIPMENT $1,160,914 $79,825 Not Implemented
UF0375 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,443 $49,050 Not Implemented
UF0375 # 07 Y:2006 07 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,590 $0 Implemented
UF0375 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,627 $180 Implemented
UF0375 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $129,429 $17,000 Implemented
UF0375 # 08 Y:2006 08 2006 DISCONNECT BALLASTS $2,018 $0 Implemented
UF0375 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,307 $33,550 Not Implemented
UF0375 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $85,158 $3,540 Implemented
UF0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,929 $15,889 Not Implemented
WV0268 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,612 $250 Implemented
WV0268 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,769 $20,880 Implemented
WV0268 # 04 Y:2003 04 2003 IMPROVE LUBRICATION PRACTICES $1,165 $810 Not Implemented
WV0268 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,261 $720 Implemented
WV0268 # 13 Y:2003 13 2003 DEVELOP A REPAIR/REPLACE POLICY $6,152 $450 Implemented
WV0268 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,262 $0 Implemented
WV0268 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,435 $108 Implemented
WV0268 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,489 $630 Not Implemented