IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3951 Pens And Mechanical Pencils
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0107 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,667 $6,750 Implemented
TT0107 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,191 $3,000 Implemented
UF0439 # 07 Y:2011 07 2011 USE COMPRESSOR AIR FILTERS $1,555 $847 Implemented
UF0439 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,430 $4,040 Implemented
UF0439 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,289 $5,193 Implemented
UF0378 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,337 $598 Implemented
UF0378 # 02 Y:2006 02 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,965 $5,044 Implemented
UF0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,845 $12,045 Implemented
UF0378 # 04 Y:2006 04 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $10,260 $2,640 Implemented
UF0378 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $4,427 $15,444 Implemented
UF0378 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,397 $507 Implemented
UF0375 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $129,429 $17,000 Implemented
UF0375 # 07 Y:2006 07 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,590 $0 Implemented
UF0375 # 08 Y:2006 08 2006 DISCONNECT BALLASTS $2,018 $0 Implemented
UF0375 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,627 $180 Implemented
UF0375 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $85,158 $3,540 Implemented
IA0188 # 06 Y:1998 06 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,415 $250 Implemented
IA0188 # 05 Y:1998 05 1998 MOVE PRODUCT USING MECHANICAL MEANS $60,833 $38,000 Implemented
IA0188 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $1,139 $1,050 Implemented
IA0188 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $1,714 Implemented
IA0188 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $1,584 $195 Implemented
IA0188 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,435 $25 Implemented
SD0166 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,470 $6,916 Implemented
SD0166 # 05 Y:1997 05 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $3,641 $4,770 Implemented
SD0166 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $2,061 $943 Implemented