Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 3951 | Pens And Mechanical Pencils |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0378 # 06 Y:2006 | 06 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $55,146 | $7,392 | Not Implemented |
UF0378 # 04 Y:2006 | 04 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $10,260 | $2,640 | Implemented |
UF0378 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,337 | $598 | Implemented |
UF0378 # 05 Y:2006 | 05 | 2006 | ADD AREA LIGHTING SWITCHES | $4,427 | $15,444 | Implemented |
UF0378 # 08 Y:2006 | 08 | 2006 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $3,397 | $507 | Implemented |
UF0378 # 02 Y:2006 | 02 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,965 | $5,044 | Implemented |
UF0378 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,845 | $12,045 | Implemented |
UF0378 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $7,955 | $7,050 | Not Implemented |
UF0375 # 09 Y:2006 | 09 | 2006 | INSTALL BACK-UP EQUIPMENT | $1,160,914 | $79,825 | Not Implemented |
UF0375 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,443 | $49,050 | Not Implemented |
UF0375 # 07 Y:2006 | 07 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $12,590 | $0 | Implemented |
UF0375 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,627 | $180 | Implemented |
UF0375 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $129,429 | $17,000 | Implemented |
UF0375 # 08 Y:2006 | 08 | 2006 | DISCONNECT BALLASTS | $2,018 | $0 | Implemented |
UF0375 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,307 | $33,550 | Not Implemented |
UF0375 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $85,158 | $3,540 | Implemented |
UF0375 # 01 Y:2006 | 01 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,929 | $15,889 | Not Implemented |
IA0188 # 06 Y:1998 | 06 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,415 | $250 | Implemented |
IA0188 # 05 Y:1998 | 05 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $60,833 | $38,000 | Implemented |
IA0188 # 04 Y:1998 | 04 | 1998 | RECOVER AND REUSE COOLING WATER | $1,139 | $1,050 | Implemented |
IA0188 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,814 | $1,714 | Implemented |
IA0188 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $1,584 | $195 | Implemented |
IA0188 # 01 Y:1998 | 01 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,435 | $25 | Implemented |
SD0166 # 08 Y:1997 | 08 | 1997 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $491 | $0 | Not Implemented |
SD0166 # 09 Y:1997 | 09 | 1997 | CLEAR AND RENT EXISTING SPACE | $370,400 | $53,750 | Not Implemented |