IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0438 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $257,500 $315,000 Implemented
BD0438 # 15 Y:2013 15 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $286 $325 Implemented
BD0438 # 14 Y:2013 14 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $674 $550 Implemented
BD0438 # 13 Y:2013 13 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,546 $30,000 Implemented
BD0438 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,591 $25 Implemented
BD0438 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,975 $34,500 Implemented
BD0438 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,466 $20,000 Implemented
BD0438 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $19,230 $25,000 Implemented
BD0438 # 07 Y:2013 07 2013 REPAIR OR REPLACE STEAM TRAPS $42,432 $1,600 Implemented
BD0438 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,324 $10,000 Implemented
BD0438 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,432 $30 Implemented
BD0438 # 04 Y:2013 04 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $52,832 $150,000 Implemented
BD0438 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $63,332 $57,300 Implemented
BD0438 # 16 Y:2013 16 2013 INSTALL OCCUPANCY SENSORS $159 $32 Implemented
BD0278 # 06 Y:2005 06 2005 RECOVER AND REUSE COOLING WATER $1,459 $5,000 Implemented
BD0278 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,770 $3,597 Implemented
BD0278 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,527 $525 Implemented
BD0278 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,148 $2,000 Implemented
BD0278 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $4,205 $16,000 Implemented
BD0275 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $121,680 $500,000 Implemented
BD0275 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,119 $6,000 Implemented
BD0275 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,985 $421 Implemented
BD0275 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,106 $6,980 Implemented
BD0275 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $360 Implemented
BD0276 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,544 $48,000 Implemented