IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0064 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $382 $888 Implemented
IP0064 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $878 Implemented
IP0064 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,082 $700 Implemented
IP0064 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,306 $250 Implemented
IP0064 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $5 Implemented
IP0064 # 01 Y:2016 01 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $839 $0 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,918 $400 Not Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,359 $770 Not Implemented
IP0049 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,511 $4,400 Not Implemented
IP0049 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $283 Not Implemented
IP0049 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $7,789 $10,000 Not Implemented
IP0049 # 09 Y:2015 09 2015 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,057 $6,011 Not Implemented
IP0049 # 10 Y:2015 10 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $5,682 $15,286 Not Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
IP0032 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $16,018 Implemented
IP0032 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $659 $556 Implemented
IP0032 # 03 Y:2014 03 2014 USE SOLAR HEAT TO HEAT WATER $69,019 $314,300 Not Implemented
IP0032 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,263 $0 Implemented
UD0735 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,665 $0 Implemented
UD0735 # 12 Y:2006 12 2006 RECOVER AND REUSE COOLING WATER $2,635 $1,000 Not Implemented
UD0735 # 13 Y:2006 13 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,293 $0 Not Implemented
UD0735 # 14 Y:2006 14 2006 USE PHOTOCELL CONTROLS $733 $308 Implemented