IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,432

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0793 # 12 Y:2010 12 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,071 $995 Implemented
OK0793 # 13 Y:2010 13 2010 UPGRADE CONTROLS ON COMPRESSORS $27,218 $30,300 Implemented
UA0055 # 01 Y:2010 01 2010 USE OPTIMUM TEMPERATURE $30,674 $1,072 Implemented
UA0055 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $12,398 $1,602 Not Implemented
UA0055 # 03 Y:2010 03 2010 USE MINIMUM SAFE OVEN VENTILATION $4,422 $990 Not Implemented
UA0055 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $14,550 $5,020 Not Implemented
UA0055 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $3,444 $1,970 Not Implemented
UA0055 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $640 Not Implemented
UA0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,014 $1,500 Implemented
UA0055 # 08 Y:2010 08 2010 USE PHOTOCELL CONTROLS $983 $354 Not Implemented
UA0055 # 09 Y:2010 09 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $341 $106 Not Implemented
UA0055 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $559 $387 Not Implemented
UA0055 # 11 Y:2010 11 2010 DISCONNECT BALLASTS $123 $80 Implemented
UA0055 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $114 $250 Not Implemented
LE0299 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $29,292 $375,000 Not Implemented
LE0299 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,307 $18,000 Not Implemented
LE0299 # 03 Y:2010 03 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,520 $66,360 Not Implemented
LE0299 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,599 $3,000 Implemented
LE0299 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,849 $800 Implemented
LE0299 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,703 $800 Implemented
LE0299 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $697 $150 Implemented
LE0299 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $13,847 Implemented
UM0367 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,074 $37,268 Implemented
UM0367 # 02 Y:2010 02 2010 COVER OPEN TANKS $4,570 $285 Not Implemented
UM0367 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,249 $1,158 Not Implemented