IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,432

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0367 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,913 $2,000 Implemented
UM0367 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,497 $200 Not Implemented
UM0367 # 06 Y:2010 06 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,997 $68,395 Implemented
UM0367 # 07 Y:2010 07 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,317 $9,800 Implemented
UM0367 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,939 $500 Implemented
UM0367 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,537 $10,500 Not Implemented
UM0367 # 10 Y:2010 10 2010 USE RADIANT HEATER FOR SPOT HEATING $4,999 $8,600 Not Implemented
UM0367 # 11 Y:2010 11 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,186 $7,500 Implemented
UM0367 # 12 Y:2010 12 2010 INSULATE BARE EQUIPMENT $573 $3,568 Not Implemented
UM0367 # 13 Y:2010 13 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $277 $329 Implemented
UM0367 # 14 Y:2010 14 2010 INSTALL STORM WINDOWS AND DOORS $171 $1,400 Implemented
GT0869 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $7,130 $2,100 Implemented
GT0869 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $0 Implemented
GT0869 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,117 $890 Implemented
GT0869 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,201 $900 Not Implemented
GT0869 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,586 $42,920 Implemented
GT0869 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,715 $17,250 Not Implemented
GT0869 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,291 $4,515 Not Implemented
AM0561 # 01 Y:2009 01 2009 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,545 $38,430 Not Implemented
AM0561 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $680 Implemented
AM0561 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $3,200 $11,050 Not Implemented
AM0561 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $15 Implemented
AM0561 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $705 $300 Implemented
AM0561 # 06 Y:2009 06 2009 PAY BILLS ON TIME TO AVOID LATE FEES $452 $0 Implemented
AM0561 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,025 $535 Implemented