Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,432

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0666 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,266 $8,500 Not Implemented
UD0666 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented
UD0666 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,020 Implemented
UD0666 # 11 Y:2003 11 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $835 $1,700 Not Implemented
UD0666 # 12 Y:2003 12 2003 DISCONNECT BALLASTS $810 $0 Not Implemented
UD0666 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $740 $100 Not Implemented
UD0666 # 14 Y:2003 14 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $635 $150 Not Implemented
UD0666 # 15 Y:2003 15 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $720 Not Implemented
UD0666 # 16 Y:2003 16 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $175 $0 Implemented
AS0341 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $6,789 Not Implemented
AS0341 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $834 $891 Not Implemented
AS0341 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $40 Implemented
AS0341 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,287 $260 Implemented
AS0341 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $193 $442 Not Implemented
AS0341 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $20,939 $0 Not Implemented
AS0341 # 07 Y:2003 07 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $23,277 $14,364 Not Implemented
AS0341 # 08 Y:2003 08 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $40,000 $616 Not Implemented
BD0222 # 01 Y:2002 01 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $185,274 $20,000 Not Implemented
BD0222 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,898 $12,020 Implemented
BD0222 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,835 $2,232 Not Implemented
BD0222 # 04 Y:2002 04 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,079 $6,000 Not Implemented
BD0222 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,027 $1,000 Not Implemented
BD0222 # 06 Y:2002 06 2002 INSTALL TURBULATORS $2,272 $3,500 Not Implemented
BD0222 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $2,219 $1,425 Not Implemented
BD0222 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,901 $2,000 Not Implemented