Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,432
matching recommendationsSIC | 399 | Miscellaneous Manufactures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0158 # 14 Y:2022 | 14 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,629 | $9,543 | Implemented |
MZ0327 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,999 | $25,044 | Not Implemented |
MZ0327 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,903 | $17,890 | Implemented |
MZ0327 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,801 | $6,385 | Not Implemented |
MZ0327 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,626 | $574,750 | Not Implemented |
MZ0327 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,649 | $16,300 | Not Implemented |
MZ0327 # 02 Y:2022 | 02 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,637 | $25,442 | Implemented |
MZ0327 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $299 | $960 | Implemented |
OK1069 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,392 | $27,027 | Implemented |
OK1069 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,879 | $0 | Implemented |
OK1069 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $612 | $304 | Implemented |
OK1069 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $156 | $488 | Implemented |
OK1069 # 05 Y:2022 | 05 | 2022 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $4,394 | $1,540 | Implemented |
WM0175 # 01 Y:2022 | 01 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $941,741 | $1,060,000 | Not Implemented |
WM0175 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $840,840 | $38,534 | Not Implemented |
WM0175 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $447,150 | $2,178,400 | Not Implemented |
WM0175 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,088 | $85,000 | Not Implemented |
WM0175 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $98,046 | $48,230 | Not Implemented |
WM0175 # 06 Y:2022 | 06 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,473 | $0 | Not Implemented |
WM0171 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,582 | $3,000 | Implemented |
WM0171 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,815 | $1,500 | Implemented |
WM0171 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,771 | $1,090 | Not Implemented |
WM0171 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,638 | $0 | Not Implemented |
WM0171 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,567 | $844 | Implemented |
WM0171 # 06 Y:2021 | 06 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,495 | $5,000 | Not Implemented |