Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,432

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0158 # 14 Y:2022 14 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,629 $9,543 Implemented
MZ0327 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,999 $25,044 Not Implemented
MZ0327 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,903 $17,890 Implemented
MZ0327 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,801 $6,385 Not Implemented
MZ0327 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $61,626 $574,750 Not Implemented
MZ0327 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,649 $16,300 Not Implemented
MZ0327 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,637 $25,442 Implemented
MZ0327 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $299 $960 Implemented
OK1069 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,392 $27,027 Implemented
OK1069 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,879 $0 Implemented
OK1069 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $612 $304 Implemented
OK1069 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156 $488 Implemented
OK1069 # 05 Y:2022 05 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,394 $1,540 Implemented
WM0175 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $941,741 $1,060,000 Not Implemented
WM0175 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $840,840 $38,534 Not Implemented
WM0175 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $447,150 $2,178,400 Not Implemented
WM0175 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,088 $85,000 Not Implemented
WM0175 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98,046 $48,230 Not Implemented
WM0175 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,473 $0 Not Implemented
WM0171 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,582 $3,000 Implemented
WM0171 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $1,500 Implemented
WM0171 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,771 $1,090 Not Implemented
WM0171 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,638 $0 Not Implemented
WM0171 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $844 Implemented
WM0171 # 06 Y:2021 06 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,495 $5,000 Not Implemented