IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0234 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $237 $0 Implemented
MS0234 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,578 $99 Implemented
MS0234 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,991 $10,304 Not Implemented
MS0234 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $40 $43 Not Implemented
MS0234 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $64 $115 Implemented
MS0234 # 05 Y:2003 05 2003 $92 $100 Not Implemented
MS0234 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $205 $416 Not Implemented
MA0532 # 02 Y:2003 02 2003 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $38,956 $84,895 Not Implemented
MA0532 # 08 Y:2003 08 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $520 $0 Not Implemented
MA0532 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,580 $0 Implemented
MA0532 # 06 Y:2003 06 2003 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,627 $1,845 Implemented
MA0532 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,385 $4,400 Implemented
MA0532 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,606 $4,400 Implemented
MA0532 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,833 $0 Implemented
MA0532 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $67,039 $7,300 Implemented
UD0666 # 03 Y:2003 03 2003 $14,700 $0 Implemented
UD0666 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $21,034 $0 Implemented
UD0666 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,698 $0 Implemented
UD0666 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $3,082 $0 Not Implemented
UD0666 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,180 $0 Not Implemented
UD0666 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,885 $0 Implemented
UD0666 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented
UD0666 # 16 Y:2003 16 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $175 $0 Implemented
UD0666 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,247 $325 Not Implemented
UD0666 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,266 $8,500 Not Implemented