IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0503 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,203 $56,758 Implemented
SD0503 # 03 Y:2010 03 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,981 $0 Implemented
SD0503 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,987 $2,250 Implemented
SD0503 # 04 Y:2010 04 2010 INSTALL SKYLIGHTS $7,467 $22,980 Implemented
IA0454 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,365 $1,560 Implemented
IA0454 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $150 Implemented
IA0454 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,152 $300 Implemented
IA0454 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $980 $400 Implemented
IA0454 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $300 Implemented
IA0454 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $218 $20 Not Implemented
IA0454 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $20 Not Implemented
IA0454 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,214 Implemented
OK0793 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $88,705 $104,400 Implemented
OK0793 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $67,527 $42,259 Not Implemented
OK0793 # 13 Y:2010 13 2010 UPGRADE CONTROLS ON COMPRESSORS $27,218 $30,300 Implemented
OK0793 # 12 Y:2010 12 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,071 $995 Implemented
OK0793 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $21,881 $4,522 Not Implemented
OK0793 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,971 $111,113 Not Implemented
OK0793 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,136 $21,130 Not Implemented
OK0793 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $8,717 $17,813 Implemented
OK0793 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,411 $69,755 Not Implemented
OK0793 # 05 Y:2010 05 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $104,850 $134,480 Not Implemented
OK0793 # 04 Y:2010 04 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $217,752 $100,000 Not Implemented
OK0793 # 03 Y:2010 03 2010 INSTALL REPLACEMENT DOORS $1,246 $33,150 Not Implemented
OK0793 # 02 Y:2010 02 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $150,096 $1,969,500 Not Implemented