IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 3991 Brooms And Brushes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0555 # 03 Y:2017 03 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,035 $6,550 Not Implemented
SD0555 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,916 $65,600 Not Implemented
SD0555 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,771 $1,100 Implemented
SD0555 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $850 Not Implemented
SD0555 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $600 Implemented
WM0087 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $190 Not Implemented
WM0087 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,991 $0 Not Implemented
WM0087 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,519 $3,325 Not Implemented
WM0087 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,712 $23,070 Not Implemented
LE0299 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $697 $150 Implemented
LE0299 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,849 $800 Implemented
LE0299 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,703 $800 Implemented
LE0299 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $29,292 $375,000 Not Implemented
LE0299 # 03 Y:2010 03 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,520 $66,360 Not Implemented
LE0299 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,599 $3,000 Implemented
LE0299 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,307 $18,000 Not Implemented
LE0299 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $13,847 Implemented
DL0036 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $231 $594 Not Implemented
DL0036 # 01 Y:2009 01 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $26,142 $14,000 Not Implemented
DL0036 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,987 $18,000 Not Implemented
DL0036 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,802 $4,000 Not Implemented
DL0036 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,127 $1,430 Not Implemented
DL0036 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,231 $0 Implemented
DL0036 # 08 Y:2009 08 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,742 $10,500 Not Implemented
DL0036 # 06 Y:2009 06 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $596 $0 Implemented