IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3993 Signs And Advertising Specialities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0137 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,626 $15,385 Implemented
WM0137 # 05 Y:2019 05 2019 USE RADIANT HEATER FOR SPOT HEATING $2,291 $2,780 Implemented
WM0137 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $629 $1,920 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented
BS0035 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $374 $15 Implemented
BS0035 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $65 $132 Implemented
BS0035 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $8,156 Implemented
BS0035 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $89 $113 Implemented
BS0035 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $340 Implemented
BS0035 # 06 Y:2014 06 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,299 $50 Implemented
BS0035 # 05 Y:2014 05 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,366 $24,165 Implemented
MI0258 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $8,441 $1,119 Implemented
MI0258 # 11 Y:2014 11 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $509 $347 Implemented
MI0258 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,675 $13,660 Implemented
MI0258 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $8 Implemented
MI0258 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,014 $15,970 Implemented
MI0258 # 06 Y:2014 06 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $5,358 $3,100 Implemented
MI0258 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,648 $1,660 Implemented
OK0853 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $300 Implemented