Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
350
matching recommendationsSIC | 3993 | Signs And Advertising Specialities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0454 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $980 | $400 | Implemented |
IA0454 # 07 Y:2010 | 07 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,152 | $300 | Implemented |
IA0454 # 08 Y:2010 | 08 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $201 | $150 | Implemented |
UA0055 # 01 Y:2010 | 01 | 2010 | USE OPTIMUM TEMPERATURE | $30,674 | $1,072 | Implemented |
UA0055 # 02 Y:2010 | 02 | 2010 | USE OPTIMUM THICKNESS INSULATION | $12,398 | $1,602 | Not Implemented |
UA0055 # 03 Y:2010 | 03 | 2010 | USE MINIMUM SAFE OVEN VENTILATION | $4,422 | $990 | Not Implemented |
UA0055 # 04 Y:2010 | 04 | 2010 | INSULATE BARE EQUIPMENT | $14,550 | $5,020 | Not Implemented |
UA0055 # 05 Y:2010 | 05 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $3,444 | $1,970 | Not Implemented |
UA0055 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,545 | $640 | Not Implemented |
UA0055 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,014 | $1,500 | Implemented |
UA0055 # 08 Y:2010 | 08 | 2010 | USE PHOTOCELL CONTROLS | $983 | $354 | Not Implemented |
UA0055 # 09 Y:2010 | 09 | 2010 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $341 | $106 | Not Implemented |
UA0055 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $559 | $387 | Not Implemented |
UA0055 # 11 Y:2010 | 11 | 2010 | DISCONNECT BALLASTS | $123 | $80 | Implemented |
UA0055 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $114 | $250 | Not Implemented |
AM0561 # 01 Y:2009 | 01 | 2009 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,545 | $38,430 | Not Implemented |
AM0561 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,920 | $680 | Implemented |
AM0561 # 03 Y:2009 | 03 | 2009 | OPTIMIZE PLANT POWER FACTOR | $3,200 | $11,050 | Not Implemented |
AM0561 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,440 | $15 | Implemented |
AM0561 # 05 Y:2009 | 05 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $705 | $300 | Implemented |
AM0561 # 06 Y:2009 | 06 | 2009 | PAY BILLS ON TIME TO AVOID LATE FEES | $452 | $0 | Implemented |
AM0561 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,025 | $535 | Implemented |
WV0363 # 10 Y:2007 | 10 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $2,611 | $4,505 | Implemented |
WV0363 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,046 | $8,058 | Implemented |
WV0363 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,878 | $8,630 | Implemented |