IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3993 Signs And Advertising Specialities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0248 # 02 Y:1995 02 1995 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $8,328 $250 Not Implemented
OR0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,459 $1,422 Not Implemented
OR0248 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $474 $1,045 Implemented
OR0248 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,487 $5,740 Not Implemented
OR0248 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $4,496 $20,400 Not Implemented
OR0248 # 01 Y:1995 01 1995 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $10,209 $0 Not Implemented
UD0469 # 05 Y:1995 05 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,600 $20,000 Not Implemented
UD0469 # 04 Y:1995 04 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,522 $1,000 Not Implemented
UD0469 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $392 Implemented
UD0469 # 02 Y:1995 02 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,980 $3,000 Not Implemented
UD0469 # 01 Y:1995 01 1995 COMBINE UTILITY METERS $3,256 $0 Implemented
WI0226 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,957 $500 Not Implemented
WI0226 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $3,891 $11,655 Not Implemented
WI0226 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,018 $500 Implemented
WI0226 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,930 $7,100 Implemented
WI0226 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,502 $0 Implemented
WI0226 # 06 Y:1995 06 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,226 $0 Not Implemented
WI0226 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $897 $0 Implemented
WI0226 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $583 $960 Implemented
WI0226 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $528 $0 Implemented
WI0226 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $23,500 $0 Not Implemented