Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 3996 | Hard Surface Floor Coverings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2322 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,162 | $716,165 | n/a |
KS2322 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $374 | $250 | n/a |
KS2322 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,242 | $12,482 | n/a |
KS2322 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $7,983 | $18,288 | n/a |
KS2322 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,624 | $0 | n/a |
KS2322 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $491 | $60 | n/a |
KS2322 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,387 | $5,480 | n/a |
KS2311 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,819 | $3,753 | Not Implemented |
KS2311 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,047 | $422,421 | Not Implemented |
KS2311 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $66,324 | $627,000 | Not Implemented |
KS2311 # 05 Y:2023 | 05 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,129 | $0 | Not Implemented |
KS2311 # 03 Y:2023 | 03 | 2023 | INSULATE FEEDWATER TANK | $4,841 | $4,104 | Not Implemented |
KS2311 # 02 Y:2023 | 02 | 2023 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $19,596 | $10,708 | Not Implemented |
KS2311 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,574 | $6,440 | Implemented |
GT0869 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $7,130 | $2,100 | Implemented |
GT0869 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,291 | $4,515 | Not Implemented |
GT0869 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,715 | $17,250 | Not Implemented |
GT0869 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,586 | $42,920 | Implemented |
GT0869 # 04 Y:2009 | 04 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,201 | $900 | Not Implemented |
GT0869 # 03 Y:2009 | 03 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,117 | $890 | Implemented |
GT0869 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $352 | $0 | Implemented |