IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3996 Hard Surface Floor Coverings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0438 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $77,861 $384,000 Not Implemented
BD0438 # 16 Y:2013 16 2013 INSTALL OCCUPANCY SENSORS $159 $32 Implemented
BD0438 # 15 Y:2013 15 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $286 $325 Implemented
BD0438 # 14 Y:2013 14 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $674 $550 Implemented
BD0438 # 13 Y:2013 13 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,546 $30,000 Implemented
BD0438 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,591 $25 Implemented
BD0438 # 11 Y:2013 11 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $14,811 $30,000 Not Implemented
BD0438 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,975 $34,500 Implemented
BD0438 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,466 $20,000 Implemented
BD0438 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $19,230 $25,000 Implemented
BD0438 # 07 Y:2013 07 2013 REPAIR OR REPLACE STEAM TRAPS $42,432 $1,600 Implemented
BD0438 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,324 $10,000 Implemented
BD0438 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,432 $30 Implemented
BD0438 # 04 Y:2013 04 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $52,832 $150,000 Implemented
BD0438 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $63,332 $57,300 Implemented
BD0438 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $257,500 $315,000 Implemented
UA0101 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $16,195 $150 Implemented
UA0101 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,664 $7,400 Not Implemented
UA0101 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,670 $80 Implemented
UA0101 # 04 Y:2013 04 2013 MINIMIZE WATER USAGE $20,266 $8,192 Not Implemented
UA0101 # 05 Y:2013 05 2013 USE PHOTOCELL CONTROLS $580 $251 Implemented
UA0101 # 06 Y:2013 06 2013 REPLACE BOILER $14,175 $112,000 Not Implemented