IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 3996 Hard Surface Floor Coverings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0213 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,484 $31,859 Not Implemented
UA0213 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,647 $100 Not Implemented
UA0213 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,098 $4,895 Implemented
UA0213 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,549 $1,294 Implemented
UA0213 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,067 $30,000 Not Implemented
UA0213 # 06 Y:2019 06 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,399 $4,370 Not Implemented
OK1011 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,499 $1,898 Implemented
OK1011 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $8,106 Not Implemented
OK1011 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $15,573 Implemented
OK1011 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,176 $71,250 Implemented
OK1011 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $13,080 $57,161 Not Implemented
OK1011 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $5,110 $63 Not Implemented
OK1011 # 07 Y:2019 07 2019 INSTALL SET-BACK TIMERS $480 $240 Not Implemented
OK1011 # 08 Y:2019 08 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,744 $35,736 Not Implemented
OK1011 # 09 Y:2019 09 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,628 $0 Implemented