IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

724

matching recommendations
Reset
SIC 3999 Manufacturing Industries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0026 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $359 $1,000 Not Implemented
TR0026 # 06 Y:2020 06 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,877 $5,000 Not Implemented
BS0136 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $4,844 Not Implemented
BS0136 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $2,100 $3,760 Not Implemented
BS0136 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,951 $77,377 Not Implemented
BS0136 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,213 $4,620 Not Implemented
BS0136 # 05 Y:2020 05 2020 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,938 $4,056 Not Implemented
BS0136 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,864 $1,500 Not Implemented
BS0136 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,209 $610 Not Implemented
BS0136 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $325 $675 Not Implemented
BS0136 # 09 Y:2020 09 2020 USE SOLAR HEAT FOR HEAT $9,114 $35,799 Not Implemented
UK1914 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $2,510 n/a
UK1914 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,217 $1,100 n/a
UK1914 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $0 n/a
UK1914 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,233 $8,100 n/a
UK1914 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $8,187 $0 n/a
UK1914 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,746 $1,370 n/a
UK1914 # 07 Y:2019 07 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $150 $0 n/a
UK1914 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $145 $80 n/a
UK1914 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,556 $21,155 n/a
UK1914 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $14,446 $12,425 n/a
LE0481 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,057 $40 Implemented
LE0481 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,696 $14,000 Not Implemented
LE0481 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $42,460 $57,500 Not Implemented
LE0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $11,688 Implemented