IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 422 Public Warehousing And Storage
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0554 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $28,395 $281,442 Implemented
AS0554 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,520 $2,832 Implemented
AS0554 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,704 $6,059 Implemented
AS0554 # 04 Y:2023 04 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,798 $2,970 Implemented
AS0554 # 05 Y:2023 05 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,680 $600 Implemented
AS0554 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,609 $1,858 Implemented
AS0554 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,513 $1,560 Implemented
AS0554 # 08 Y:2023 08 2023 USE PHOTOCELL CONTROLS $805 $1,700 Implemented
WV0638 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $674 $2,060 Implemented
WV0638 # 07 Y:2023 07 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $631 $2,910 Implemented
WV0638 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,424 $11,600 Implemented
WV0638 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,432 $10,200 Implemented
WV0638 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $90 $100 Implemented
AM0867 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $263,000 $452,400 Implemented
WM0186 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,140 $5,250 Implemented
WM0186 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99,547 $82,860 Implemented
WM0186 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,467 $0 Implemented
LS0523 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,765 $2,680 Implemented
LS0523 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $4,193 $750 Implemented
LS0523 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $666 $148 Implemented
IC0272 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,712 $3,525 Implemented
IC0272 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $1,098 Implemented
IC0272 # 04 Y:2023 04 2023 AIR CONDITION ONLY SPACE NECESSARY $647 $0 Implemented
IC0272 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $341 $35 Implemented
AS0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $317 Implemented