Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 4731 | Freight Transportation Arrangement |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0580 # 09 Y:2022 | 09 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,516 | $594 | Implemented |
UF0580 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $383,709 | $1,629,000 | Not Implemented |
UF0580 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $44,200 | $57,498 | Implemented |
UF0580 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $18,832 | $31,696 | Implemented |
UF0580 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,115 | $20,214 | Implemented |
UF0580 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,686 | $42,931 | Not Implemented |
UF0580 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,465 | $8,588 | Implemented |
UF0580 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $3,037 | $2,270 | Implemented |
UF0580 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $10,501 | Implemented |
DL0205 # 02 Y:2022 | 02 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,896 | $0 | Not Implemented |
DL0205 # 09 Y:2022 | 09 | 2022 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $21,960 | $20,995 | Not Implemented |
DL0205 # 08 Y:2022 | 08 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,193 | $3,716 | Not Implemented |
DL0205 # 07 Y:2022 | 07 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,276 | $64 | Not Implemented |
DL0205 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,057 | $0 | Not Implemented |
DL0205 # 05 Y:2022 | 05 | 2022 | ELIMINATE/REDUCE AN OPERATION | $2,351 | $0 | Not Implemented |
DL0205 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,368 | $0 | Implemented |
DL0205 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,040 | $0 | Not Implemented |
DL0205 # 01 Y:2022 | 01 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $820 | $0 | Not Implemented |
DL0204 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM TEMPERATURE | $1,182 | $0 | Implemented |
DL0204 # 01 Y:2022 | 01 | 2022 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $18,234 | $0 | Not Implemented |
DL0204 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $491 | $45 | Implemented |
DL0204 # 04 Y:2022 | 04 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $32,583 | $1,300 | Not Implemented |
DL0204 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,599 | $24,771 | Not Implemented |
DL0204 # 06 Y:2022 | 06 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $8,754 | $18,145 | Not Implemented |
DL0204 # 07 Y:2022 | 07 | 2022 | ADJUST VENTS TO MINIMIZE ENERGY USE | $836 | $465 | Implemented |