Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,414
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2518 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,278 | $403,650 | n/a |
LS2518 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $292 | $510 | n/a |
LS2518 # 02 Y:2025 | 02 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $23,606 | $141,000 | n/a |
MUWT07 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29 | $90 | n/a |
MUWT07 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $124 | $8 | n/a |
MUWT07 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $706 | $432 | n/a |
MUWT07 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,429 | $6,434 | n/a |
MUWT07 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $454 | $562 | n/a |
MUWT07 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $105 | $38 | n/a |
UU0276 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,440 | $14,700 | n/a |
UU0276 # 06 Y:2025 | 06 | 2025 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $339 | $990 | n/a |
UU0276 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $30,600 | $110,000 | n/a |
UU0276 # 03 Y:2025 | 03 | 2025 | MODIFY STARTUP/SHUTDOWN TIMES | $2,950 | $3,600 | n/a |
UU0276 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,500 | $110,000 | n/a |
UU0276 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,400 | $657,000 | n/a |
IC0328 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $101,072 | $435,474 | n/a |
IC0328 # 05 Y:2025 | 05 | 2025 | USE EXISTING DAM TO GENERATE ELECTRICITY | $6,679 | $33,300 | n/a |
IC0328 # 03 Y:2025 | 03 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $239 | $0 | n/a |
IC0328 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $82,241 | $385,393 | n/a |
IC0328 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $244 | $694 | n/a |
UW2508 # 02 Y:2025 | 02 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $665 | $8,888 | n/a |
UW2508 # 04 Y:2025 | 04 | 2025 | INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING | $116,528 | $582,640 | n/a |
UW2508 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $841 | $8,448 | n/a |
UW2508 # 01 Y:2025 | 01 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $272 | $6,858 | n/a |
UW2507 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $399,297 | $329,940 | n/a |