IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0832 # 01 Y:2022 01 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,405 $900 Not Implemented
MA0832 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $3,806 $2,150 Implemented
MA0832 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $1,101 $12,675 Implemented
MA0832 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,184 $600 Implemented
WM0174 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,961 $8,440 Not Implemented
WM0174 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,050 $8,821 Implemented
WM0174 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,934 $1,200 Not Implemented
WM0174 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $0 Implemented
WM0174 # 05 Y:2022 05 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,794 $0 Not Implemented
WM0174 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,216 $0 Implemented
WM0174 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $821 $735 Not Implemented
WM0174 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $716 $850 Implemented
WM0174 # 09 Y:2022 09 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $0 Not Implemented
OR0747 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $487 $1,546 Not Implemented
OR0747 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,708 $7,587 Not Implemented
OR0747 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $57,063 $757,015 Not Implemented
UU0197 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $13,098 $10,000 Implemented
UU0197 # 02 Y:2022 02 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $12,033 $300 Implemented
UU0197 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,900 $3,000 Implemented
UU0197 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,230 $4,000 Implemented
UU0197 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $1,591 $6,000 Not Implemented
UU0197 # 06 Y:2022 06 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $130 $25 Implemented
UU0197 # 07 Y:2022 07 2022 USE OPTIMUM TEMPERATURE $380 $200 Not Implemented
MZ0322 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,809 $9,182 Not Implemented
MZ0322 # 02 Y:2021 02 2021 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $61,530 $226,000 Not Implemented