IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0991 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,716 $0 Not Implemented
UD0991 # 02 Y:2019 02 2019 USE POWER DURING OFF-PEAK PERIODS $15,085 $0 Implemented
UD0991 # 03 Y:2019 03 2019 MINIMIZE WATER USAGE $10,365 $0 Not Implemented
UD0991 # 04 Y:2019 04 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,066 $0 Not Implemented
WV0572 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,987 $1,000 Implemented
WV0572 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,442 $38,062 Not Implemented
WV0572 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,835 $6,336 Not Implemented
WV0572 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,205 $2,889 Implemented
WV0572 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $2,814 $587 Implemented
WV0572 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,232 $5,400 Not Implemented
BS0119 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36 $30 Not Implemented
BS0119 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $165 Not Implemented
BS0119 # 03 Y:2019 03 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,022 $30 Not Implemented
BS0119 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $20 Not Implemented
AS0468 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $282,838 $718,201 Implemented
AS0468 # 02 Y:2019 02 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $133,287 $240,000 Implemented
AS0468 # 03 Y:2019 03 2019 AIR CONDITION ONLY SPACE NECESSARY $12,668 $21,240 Implemented
AS0468 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,290 $400 Implemented
MZ0263 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $2,278 Implemented
MZ0263 # 02 Y:2019 02 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,027 $7,760 Implemented
MZ0263 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $2,053 $2,760 Implemented
MA0796 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,315 $14,350 Not Implemented
MA0796 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,245 $6,660 Not Implemented
MA0796 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,193 $200 Implemented
MA0796 # 04 Y:2019 04 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,678 $300 Not Implemented