IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0099 # 06 Y:2012 06 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $320,000 $3,600,000 Not Implemented
DL0099 # 05 Y:2012 05 2012 USE OPTIMUM TEMPERATURE $2,940 $100 Implemented
DL0099 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,410 $100 Implemented
DL0099 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,698 $17,843 Implemented
DL0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,900 $11,930 Implemented
DL0099 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,066 $12,089 Implemented
OR0595 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,800 $8,370 Implemented
OR0595 # 02 Y:2012 02 2012 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $39,919 $200,000 Not Implemented
OR0595 # 03 Y:2012 03 2012 RECOVER MECHANICAL ENERGY $1,034 $780 Implemented
OR0595 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $9,290 $9,500 Not Implemented
OR0595 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,312 $4,888 Implemented
MA0698 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,076 $9,870 Not Implemented
MA0698 # 06 Y:2012 06 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,103 $5,900 Not Implemented
MA0698 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,082 $4,410 Not Implemented
MA0698 # 04 Y:2012 04 2012 REDESIGN PROCESS $7,448 $22,500 Not Implemented
MA0698 # 03 Y:2012 03 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,992 $28,000 Not Implemented
MA0698 # 02 Y:2012 02 2012 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,226 $6,500 Not Implemented
MA0698 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,300 $1,000 Not Implemented
SD0452 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $48,619 $2,000 Implemented
SD0451 # 04 Y:2012 04 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,240 $9,000 Not Implemented
SD0451 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,577 $2,373 Implemented
SD0452 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,957 $15,925 Implemented
SD0451 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $134,300 $455,000 Not Implemented
SD0451 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,395 $14,332 Implemented
SD0451 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,815 $17,500 Not Implemented