Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
288
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0143 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $50,956 | $54,000 | Not Implemented |
IP0143 # 01 Y:2020 | 01 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $233 | $0 | Implemented |
IP0143 # 08 Y:2020 | 08 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $118,506 | $210,000 | Not Implemented |
IP0143 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,059 | $1,227 | Implemented |
IP0143 # 10 Y:2020 | 10 | 2020 | INSULATE BARE EQUIPMENT | $27,535 | $79,808 | Not Implemented |
IP0143 # 04 Y:2020 | 04 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,298 | $420 | Implemented |
IP0143 # 05 Y:2020 | 05 | 2020 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $474 | $461 | Not Implemented |
IP0143 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,901 | $48 | Implemented |
IP0143 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,444 | $143 | Not Implemented |
IP0143 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,338 | $16,716 | Implemented |
BS0143 # 03 Y:2020 | 03 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $68,374 | $200,000 | Not Implemented |
BS0143 # 01 Y:2020 | 01 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,379 | $1,225,000 | Not Implemented |
BS0143 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $11 | $25 | Not Implemented |
AM0815 # 01 Y:2020 | 01 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,330 | $4,570 | Not Implemented |
AM0815 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $210 | $200 | Not Implemented |
AM0815 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,600 | $3,770 | Not Implemented |
AM0815 # 03 Y:2020 | 03 | 2020 | USE SYNTHETIC LUBRICANT | $520 | $200 | Implemented |
DL0185 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,630 | $10,000 | Not Implemented |
DL0185 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,920 | $100,000 | Implemented |
DL0185 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,360 | $10,000 | Not Implemented |
DL0185 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $1,594 | Implemented |
DL0185 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $880 | $1,036 | Implemented |
DL0185 # 04 Y:2020 | 04 | 2020 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,790 | $35,300 | Not Implemented |
AS0495 # 01 Y:2020 | 01 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,643 | $3,941 | Implemented |
AS0495 # 05 Y:2020 | 05 | 2020 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $138 | $33 | Implemented |