Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 4911 | Electric Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0211 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,109 | $3,750 | Implemented |
TT0211 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $25,620 | $100 | Not Implemented |
TT0211 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM TEMPERATURE | $67,812 | $300,000 | Not Implemented |
TT0211 # 04 Y:2018 | 04 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $73,737 | $75,000 | Not Implemented |
TT0211 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $89,245 | $600,000 | Not Implemented |
TT0211 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $96,921 | $15,000 | Not Implemented |
TT0211 # 01 Y:2018 | 01 | 2018 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $115,103 | $150,000 | Implemented |
OR0579 # 06 Y:2012 | 06 | 2012 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,805 | $18,596 | Not Implemented |
OR0579 # 07 Y:2012 | 07 | 2012 | USE PHOTOCELL CONTROLS | $17,340 | $46,680 | Implemented |
OR0579 # 05 Y:2012 | 05 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,281 | $12,000 | Not Implemented |
OR0579 # 04 Y:2012 | 04 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,300 | $8,200 | Not Implemented |
OR0579 # 03 Y:2012 | 03 | 2012 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,346 | $55,000 | Implemented |
OR0579 # 02 Y:2012 | 02 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $125,819 | $198,800 | Not Implemented |
OR0579 # 01 Y:2012 | 01 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,066 | $0 | Implemented |
OR0552 # 01 Y:2009 | 01 | 2009 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $517,700 | $1,250,000 | Not Implemented |
OR0552 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $18,800 | $16,200 | Not Implemented |
OR0552 # 03 Y:2009 | 03 | 2009 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,900 | $7,400 | Not Implemented |
OR0552 # 02 Y:2009 | 02 | 2009 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,900 | $20,000 | Not Implemented |