Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
556
matching recommendationsSIC | 4941 | Water Supply |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0722 # 01 Y:2014 | 01 | 2014 | USE POWER DURING OFF-PEAK PERIODS | $11,298 | $500 | Implemented |
MA0722 # 02 Y:2014 | 02 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $10,940 | $1,500 | Not Implemented |
MA0722 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,147 | $9,900 | Not Implemented |
MA0722 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $2,443 | $3,000 | Not Implemented |
MA0722 # 05 Y:2014 | 05 | 2014 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,818 | $2,750 | Not Implemented |
MA0722 # 06 Y:2014 | 06 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,742 | $1,450 | Not Implemented |
MA0722 # 07 Y:2014 | 07 | 2014 | REDUCE VENTILATION AIR | $1,630 | $3,750 | Not Implemented |
MA0722 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $998 | $200 | Implemented |
MA0722 # 09 Y:2014 | 09 | 2014 | PAY UTILITY BILLS ON TIME | $949 | $500 | Not Implemented |
MA0722 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $599 | $1,600 | Not Implemented |
MA0709 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,306 | $74,300 | Not Implemented |
MA0709 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,578 | $162,500 | Not Implemented |
MA0709 # 03 Y:2013 | 03 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,963 | $60,000 | Not Implemented |
MA0709 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $588 | $200 | Implemented |
OR0605 # 01 Y:2013 | 01 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,401 | $11,850 | Not Implemented |
OR0605 # 02 Y:2013 | 02 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $29,593 | $32,655 | Implemented |
OR0605 # 03 Y:2013 | 03 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $23,767 | $234,289 | Not Implemented |
MA0698 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,300 | $1,000 | Not Implemented |
MA0698 # 02 Y:2012 | 02 | 2012 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,226 | $6,500 | Not Implemented |
MA0698 # 03 Y:2012 | 03 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,992 | $28,000 | Not Implemented |
MA0698 # 04 Y:2012 | 04 | 2012 | REDESIGN PROCESS | $7,448 | $22,500 | Not Implemented |
MA0698 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,082 | $4,410 | Not Implemented |
MA0698 # 06 Y:2012 | 06 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,103 | $5,900 | Not Implemented |
MA0698 # 07 Y:2012 | 07 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,076 | $9,870 | Not Implemented |
SD0441 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,647 | $100 | Implemented |