Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,735
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0032 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $400 | $297 | n/a |
SJ0032 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $869 | $0 | n/a |
SJ0032 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $123 | $0 | n/a |
SJ0032 # 01 Y:2025 | 01 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $129,492 | $206,023 | n/a |
SJ0032 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $2,349 | n/a |
SJ0032 # 04 Y:2025 | 04 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $5,400 | $34,907 | n/a |
OK1132 # 03 Y:2024 | 03 | 2024 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $7,784 | $4,200 | n/a |
OK1132 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,493 | $4,158 | n/a |
OK1132 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,986 | $421,200 | n/a |
OK1132 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $10,195 | $4,264 | n/a |
UW2413 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,582 | $7,250 | n/a |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | n/a |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | n/a |
UW2413 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $53 | $229 | n/a |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | n/a |
UW2413 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,186 | $5,713 | n/a |
DL0243 # 03 Y:2024 | 03 | 2024 | ELIMINATE/REDUCE AN OPERATION | $2,346 | $520 | n/a |
DL0243 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,211 | $64,000 | n/a |
DL0243 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,139 | $51,000 | n/a |
MUWT06 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $106 | $0 | n/a |
MUWT06 # 07 Y:2024 | 07 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,231 | $0 | n/a |
MUWT06 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,226 | $5,494 | n/a |
MUWT06 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,582 | $8,363 | n/a |
MUWT06 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20 | $20 | n/a |
MUWT06 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,139 | $563 | n/a |