IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,666

matching recommendations
Reset
SIC 495 Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0721 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $1,700 $12,122 Not Implemented
SF0537 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,931 $378 Not Implemented
SF0537 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,708 $260 Implemented
SF0537 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $94,349 $10,000 Not Implemented
SF0537 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,414 $648 Implemented
SF0537 # 05 Y:2019 05 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $24,937 $5,000 Not Implemented
SF0537 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,025 $5,039 Implemented
SF0537 # 07 Y:2019 07 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,238 $3,000 Implemented
SF0537 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,542 $235,055 Implemented
SF0537 # 09 Y:2019 09 2019 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $41,345 $175,000 Not Implemented
TR0013 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $1,099 $216 Implemented
TR0013 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,439 $0 Implemented
TR0013 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,097 $7,743 Implemented
MA0803 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,194 $11,175 Implemented
MA0803 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,308 $1,000 Implemented
MA0803 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $3,589 Implemented
MA0803 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $525 $2,000 Not Implemented
NL0030 # 01 Y:2019 01 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $12,000 $102,830 Not Implemented
NL0030 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,716 $22,557 Implemented
NL0030 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $421 Implemented
MZ0267 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,711 $4,573 Implemented
MZ0267 # 02 Y:2019 02 2019 USE PHOTOCELL CONTROLS $1,079 $410 Not Implemented
MZ0267 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $53,575 $240,000 Implemented
MZ0267 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $15,813 $73,900 Implemented
MZ0267 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $866 $0 Not Implemented