IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 4953 Refuse Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0849 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $71,703 $867,640 Not Implemented
AM0849 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $362 $30 Implemented
AM0849 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,245 $1,000 Implemented
AM0849 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $830 Implemented
AM0849 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $9,300 $14,300 Implemented
AM0849 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,157 $360 Implemented
AM0849 # 03 Y:2022 03 2022 ADOPT IN-HOUSE MATERIAL GENERATION $15,440 $21,500 Not Implemented
AM0849 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,625 $37,000 Implemented
AM0849 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,395 $1,530 Not Implemented
AM0849 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $344 $0 Implemented
AM0849 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $6,765 $560 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
AM0786 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $910 $290 Implemented
AM0786 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,760 $4,570 Implemented
AM0786 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,750 $22,600 Implemented
AM0786 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,800 $67,044 Implemented
LL0331 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $323,997 $61,880 Implemented
LL0331 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,477 $1,200 Implemented
LL0331 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,741 $2,100 Not Implemented
LL0331 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $1,250 Not Implemented
LL0331 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $923 $530 Not Implemented
LL0331 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $523 $546 Not Implemented