IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

232

matching recommendations
Reset
SIC 50 Wholesale Trade
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0010 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,003 $0 n/a
CI0010 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,279 $12,078 n/a
LE0538 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $3,047 $0 Implemented
LE0538 # 11 Y:2023 11 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,629 $46,896 Not Implemented
LE0538 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,656 $1,200 Not Implemented
LE0538 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,256 $2,500 Implemented
LE0538 # 04 Y:2023 04 2023 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,452 $1,992 Not Implemented
LE0538 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,576 $4,000 Implemented
LE0538 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,166 $4,521 Implemented
LE0538 # 07 Y:2023 07 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $49,716 $58,635 Not Implemented
LE0538 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $2,000 Implemented
LE0538 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,125 $18,761 Not Implemented
LE0538 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $459 $1,341 Not Implemented
AS0533 # 06 Y:2022 06 2022 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $243 $852 Not Implemented
AS0533 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $597 $163 Not Implemented
AS0533 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $57,834 $453,050 Not Implemented
AS0533 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $291 $600 Implemented
AS0533 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,662 $30,425 Implemented
AS0533 # 03 Y:2022 03 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $11,409 $630 Implemented
AM0869 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,141 $137,722 n/a
AM0869 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $57,664 $468,000 n/a
AM0869 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $56,855 $1,012,500 n/a
IC0248 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $94,808 $23,408 Not Implemented
IC0248 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,148 $4,150 Not Implemented
IC0248 # 02 Y:2021 02 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,744 $0 Implemented